Seth Atmasingh Jessasingh Bankebihari ENT Hospital

24 May 2020 13:13:07

4_1  H x W: 0 x
Based on work done in phase-I for second floor, phase-II will target complete restoration of first and ground floor. Dilapidating parts of the structure shall be restored and strengthened. Walls and flooring shall be redone. Spaces shall be realigned and refurbished as per requirements of the user department.
Powered By Sangraha 9.0